February 25, 2012

work in progress - kushi house - Djurovo 2011

 the original house...1907...stone wall on the lower level, wooden-clay wall on the first floor, big stones on the roof
exterior paving...
roof repairs...bai boris and his men
 the existing floor slab...stone slab!...I start from now to say thanks to Nyasha for the help!
 kushi at work...hard work!!
clay for the wall repairs...many thanks to Varvara for the help...http://www.rahovitza.org/

reed panels...natural thermo insulation from Serbia...http://www.milex.rs/

lime plaster on the outside...just in time before the big ice!

waiting for the spring!